Kanban Card Calculator
Calculate the correct number of Kanban cards required to control a replenishment loop. Protect against variability using minimum necessary inventory.
Loop Parameters
Small10
Control Requirements
Required Kanban Cards
4
Total System Cards
- Max Authorized WIP
- 40 units
- Coverage Time
- 0.7 shifts
Formula Reference: N = Ceil((Demand × Lead Time × (1 + Margin)) ÷ Size)
Run full simulations
The AMC Platform provides structural modeling, constraint analytics, and daily value-stream flow management.
Explore Platform