Kanban Card Calculator

Calculate the correct number of Kanban cards required to control a replenishment loop. Protect against variability using minimum necessary inventory.

Loop Parameters

Small10

Control Requirements

Required Kanban Cards

4

Total System Cards

Max Authorized WIP
40 units
Coverage Time
0.7 shifts
Formula Reference: N = Ceil((Demand × Lead Time × (1 + Margin)) ÷ Size)

Run full simulations

The AMC Platform provides structural modeling, constraint analytics, and daily value-stream flow management.

Explore Platform